Project
|
Percentage
|
Cost in GRD
|
|
1. | Excavation of sea bottom | 2,32% | 19.840.000 |
2. | Reef landfills with the use of dredges | 0,43% | 3.680.000 |
3. | Reef landfills with the use of material from borrow pit | 22,70% | 194.400.000 |
4. | Reforming of sea bottom with sandgravel | 1,42% | 12.160.000 |
5. | Riprap (0-100, 100-200 kgr) | 50,69% | 433.988.000 |
6. | Natural blocks of stone from the quarries A' class | 2,08% | 17850000 |
7. | Natural blocks of stone from the quarries (2700-4000, 4000-5300 kgr) | 1,43% | 12.238.000 |
8. | Reef construction with the use of concrete | 2,29% | 19.565.000 |
9. | Deep vibro compacted method | 16,64% | 142.500.000 |
Total | 100,00% | 856.221.000 |