FINAL CROSS SECTION

Zoom
Crater of the vibro compacted method

From the beginning of the construction phase, it was found out that the vibro compacted method could not be carried out, so the construction company turned to its own complementary studies.This was due to the fact that, while the vibro compacted project has already been put into practice, it was found out that the rate of fine-grained materials exceeded by far 20% (it was on the order of 40%), while the optimum application of the method requires a percentage from 10 to 20%. Consequently, the ground could not be compressed using the simple method of condensation. Then, other solutions were sought, such as the addition of coarse-grained material in order to enrich the bottom material and perform excavations at larger depths.

Zoom
Excavation Cross Section
The contractor carried out a new study on the risk of liquefaction.
The solution that was finally chosen provided for the typical cross section of the project by founding through a general excavation at 17.00 m and a local one at -20 m, 10 metres in length. This solution presents the features of a 'floating foundation' in most cross sections of the project.

It also presents important construction advantages, since it is virtually a simplification of the conventional method of construction.

Technical studies

Project construction

Timeschedule

Financial data