LANDFILLS BEHIND THE FRONT'S QUAY WALLS

At this phase of construction, the area behind the quay walls will be landfilled up to the level of 2.10. This landfill will extend, with reduced height, to the other side of the artificial island, where the marina is constructed, and will end up at the height of its quay-walls superstructure.

Landfill Material

  1. Granular, non-cohesive materials or materials coming from borrow pits.
  2. Excavation products coming from the sandy bottom of the marina and the port.

 
   