QUAY-WALL SUPERSTRUCTURES AT THE FRONT
OF THE ARTIFICIAL ISLAND

Concrete Construction

After installation of the boxes, riprap filling of their back cells, construction of the relief prism and landfills behind the cellular box caissons, follows the construction of the caisson superstructure slab.

Zoom
Caisson superstructure slab
The caisson superstructure slab is built of concrete in situ, placed both directly on the ripraps of the back cells and on prefabricated supporting slabs at the level of the
front-cells' roof.

The superstructure slab is 0.50-m wide on the roof where the final layer of concrete is spread for the formation of castings.

At the locations of ramps of the car ferries, enhanced reinforcement is placed.

Zoom
Reinforcement of ramps

   