TRANSPORT - INSTALLATION

The produced were towed to the installation location

 
 

Installation made use of the following:

  • 8 wooden decks, which were placed with the use of a construction crane
  • 4 submerging water pumps (one on each corner).
  • A generator
  • A switch board for pumps
The process of installation was extremely delicate, because there was a risk of turnover during transport. In the location of installation, the box caisson was connected to the previous caisson through the placed bollards and installation began with the help of a diver and 2 surveyors (one in the caisson and the other on the land).
 

The placing of the caisson was followed by the removal of the plugs by a group of divers and filling with water.

 