Caisson Equalizing Layer
-
Construction Period: 9 months
-
Monthly average: 1280 m^2
-
Mean daily output: 51.20 m^2
-
Equipment:
-
SAT1 70 m^3 long barge with crushed material
-
Tugboat for the transport of the crane and barge, Nestor oil tanker
-