Introduction | Excavations | Cross Section | Construction | Concrete Construction | Other Issues | Transport-Installation | Gravel Filling | Quay Walls | Equipment Performance
 

CONSTRUCTION OF ATTENUATION HOLES

Outer Holes

Inner Holes

The removal of the steel rings of the holes was done manually by a worker seated on a hanging deck aupported by a crane.  

asf (~300KB)

avi (~10MB)


   

Previous Page

Technical studies

Project construction

Financial data